- Low volume production of expansion tanks
- Full service supply, WCM designed, prototyped, tool and part manufacture
- Vibration welded and 100% leak test in WCM clean hall assembly facility
- MIRA tested and certified
- Tooling design, manufacture and production part introduction 9 weeks
|
Download our casestudies brochure
|